Wednesday, October 21, 2009

How To Cover Wrinkles With Make-up

Die letzte Schicht


Date: 20 October 2009 the material for the last layer must be applied before the artificial turf of the 3rd Generation down the first time on the pitch may be, is already available in the parking areas at the sports ground at the Emanuelstrasse. How long this work needs to be, depends on the weather conditions.

The head ball pendulum has now found its new location on the sports field, is behind the first goal this week, the head ball training on natural grass

The at least temporary solution to take place for the substitute: the "old" banks with a new look.

At least part of the Flutlichmasts is repainted.

remains at the rear end of the sports facility of the DJK Vierlinden a greater proportion Natural grass.

on the small playing field was already with the application of the last "rubber coating" started.

Such is the device with which the elastic layer is distributed.

the coming crowds have already created enough seating.

Even the Wall already starts to green.


Old doors, new paint.

0 comments:

Post a Comment